Design of Supply Networks under Service Constraints

Short description
This project jointly considers the problem of location planning, capacity planning, and transportation mode selection for production-distribution networks. The goal is to design networks that meet strategic service requirements like, for example, preset on-time delivery rates for customers.
Selected Publications and Talks
- Meisel, F.; Bierwirth, C.: The Design of Make-to-Order Supply Networks under Uncertainties using Simulation and Optimisation, International Journal of Production Research, 2014, in press
- Meisel, F.: Multi-Period Supplier Selection and Supplier Development under Dynamic and Uncertain Demand, in: Bogaschwesky, R. et al. (Eds.): Supply Management Research, Springer-Verlag Berlin, 2012, 3-27
- Meisel, F.: Multi-Period Supplier Selection and Supplier Development under Dynamic and Uncertain Demand, 5. Scientific Symposium "Supply Management" of the BME e.V., Würzburg, 06.03.2012
- Meisel, F.; Bierwirth, C.: Design of Logistics Networks for Make-To-Order Production, Tagung der Wissenschaftlichen Kommission Produktionswirtschaft, 12.11.2011
- Meisel, F.; Bierwirth, C.: The Design of Make-To-Order Supply Networks by Means of Simulation-Optimization, Annual Conference of the GOR 2011, Zürich, 31.08.2011
- Meisel, F.; Bierwirth, C.: Simulation-based Design of Make-to-Order Production- and Distribution-Networks, VI. German-Russian Logistics-Workshop DR-LOG '11, Bremen, 13.5.2011
- Meisel, F.: The Design of Supply Networks under Maximum Customer Order Lead Times. Interuniversity Centre on Enterprise Networks, Logistics and Transportation (CIRRELT), Montréal (Canada), 25.05.2010
- Meisel, F.; Bierwirth, C.: Supply Chain Design with an Order Lead Time Constraint, Logistics Management 2009 (LM09), Hamburg, 03.09.2009